NCMA
You are not signed in | Login hereBack | Close
Online Store | Product Details
 
 
CSOD: WC12 - How to Successfully Implement an Over Target Baseline/Schedule from a Government Perspective - C01
by Joseph C. Annuziato and Dan Donaldson
 
 
Author / Presenter:Joseph C. Annuziato and Dan Donaldson
Language:English
Note:This product is downloadable.
 
Member price:
25.00
Non-member price: 35.00
Your price:35.00
Price List: Click here to show or hide the list.
 
 


DESCRIPTION
In recent years, over target baseline/schedule implementations have been accomplished with varying degrees of success. This session will address the proper way to implement an over target baseline/schedule from a government perspective. The purpose is to provide both government and industry professionals a general understanding of the processes and decisions that must be considered when implementing an over target baseline and to assist the earned value management community in the understanding and implementation of this important management tool. It will also incorporate examples and lessons learned from recent implementations.

Difficulty Level: Advanced

Presenters:
Joseph Annunziato, CPCM, Fellow, USAF Space and Missle Center Los Angeles AFB Tecolote Research
Dan Donaldson, Tecolote Research, Inc.

Recorded at World Congress 2012

This is a downloadable product in the form of a zip file. The zip file contains the following:
- Windows Media Video file
- 1 Printable PDF file containing the certificate of completion and copy of the PowerPoint slides

Copyright © 2012 National Contract Management Association. All rights reserved. The listings and the contents of this file are proprietary and cannot be reproduced in an electronic format without written permission from the copyright holder.

TOPIC
Conference Sessions on Demand



About NCMA | Contact Us | Anti-Spam Policy | ©2012 National Contract Management Association

21740 Beaumeade Circle, Suite 125, Ashburn, Virginia 20147
571.382.0082 | 800.344.8096 | 703.448.0939 fax |
www.ncmahq.org